Natural Gas
Liquid Natural Gas (LNG) Receiving Terminal and Regasification (East Java, Indonesia)
From the East Java industrial energy demand background, we have developed an alternate plan to develop a preliminary configuration in 2 phases. The first phase is to use 125,000 M3 of Liquefied Natural Gas (LNG) floating storage to supply 88 MMSCFD industrial gas demand in East Java. The second phase is to build a 360 MMSCFD capacity LNG Terminal and Regasification facility using GraviFloat Technology in Lamongan, East Java.
The floating LNG terminal and its support facilities will provide the following benefits:
Receiving LNG into 125,000 M3 Floating Storage system (proposed LNG Terminal in Lamongan, East Java) and deliver the LNG to customers via the distribution support facilities system.
Provide LNG to customer as an alternative energy.
During first phase the ability to provide and deliver 88 MMSCFD LNG to industrial users in several areas.
Support 360 MMSCFD LNG for distribution during the second phase.
Ability to deliver 56.12 m3 LNG by truck each trip.
The Major LNG Distribution Facilities Support System consists of:
LNG Floating Terminal Capacity 125,000 M3;
2 X 30 inch Submarine Cryogenic Pipe length 1.5 KM;
88 units 2 x 60 M3 capacity LNG Satellite Station;
74 x 56.12 M3 LNG Container Trucks.

(click image to enlarge)

(click image to enlarge)
Project Cost:
DESCRIPTION |
| |
TOTAL CAPITAL INVESTMENT | US$ | 199,532,218 |
INTEREST DURING CONSTRUCTION (IDC) | US$ | 41,199,412 |
TOTAL WORKING CAPITAL (WC) | US$ | 114,233,583 |
TOTAL CAPITAL INVESTMENT + IDC + WC | US$ | 354,965,213 |
Date copyright:
PT. Petrogas Jatim Utama (PJU)
(East Java Province Enterprise, Indonesia)