Natural Gas

Liquid Natural Gas (LNG) Receiving Terminal and Regasification (East Java, Indonesia)
Natural Gas


From the East Java industrial energy demand background, we have developed an alternate plan to develop a preliminary configuration in 2 phases. The first phase is to use 125,000 M3 of Liquefied Natural Gas (LNG) floating storage to supply 88 MMSCFD industrial gas demand in East Java. The second phase is to build a 360 MMSCFD capacity LNG Terminal and Regasification facility using GraviFloat Technology in Lamongan, East Java.

 

The floating LNG terminal and its support facilities will provide the following benefits:

  • Receiving LNG into 125,000 M3 Floating Storage system (proposed LNG Terminal in Lamongan, East Java) and deliver the LNG to customers via the distribution support facilities system.

  • Provide LNG to customer as an alternative energy.

  • During first phase the ability to provide and deliver 88 MMSCFD LNG to industrial users in several areas.

  • Support 360 MMSCFD LNG for distribution during the second phase.

  • Ability to deliver 56.12 m3 LNG by truck each trip.

Floating Receiving Terminal
(click image to enlarge)
 

The Major LNG Distribution Facilities Support System consists of:

  • LNG Floating Terminal Capacity 125,000 M3;

  • 2 X 30 inch Submarine Cryogenic Pipe length 1.5 KM;

  • 88 units 2 x 60 M3 capacity LNG Satellite Station;

  • 74 x 56.12 M3 LNG Container Trucks.

East Java LNG Supply
(click image to enlarge)

 

Filling Container
(click image to enlarge)
 
Truck Table
(click image to enlarge)
 

Project Cost:

DESCRIPTION

 

TOTAL CAPITAL INVESTMENT

US$

199,532,218

INTEREST DURING CONSTRUCTION (IDC)

US$

  41,199,412

TOTAL WORKING CAPITAL (WC)

US$

 114,233,583

TOTAL CAPITAL INVESTMENT + IDC + WC

US$

354,965,213